Perfection is our goal excellence will be tolerated

McCarran Airport Terminal 3 Central Plant Las Vegas, NV

Terminal 3 includes 1.8 million square feet of terminal on three levels, 14 new aircraft gates, terminal facilities for an existing 30-gate concourse that is linked by an ATS people mover system, and a new central plant to service these facilities.  Wright Engineers provided structural engineering services for the 100,000 square foot central plant.