Tilt-Up & Industrial

1 2 3
Three Square Food Bank North Las Vegas, NV
Three Square Food Bank North Las Vegas, NV
Renovation of Three Square’s existing facility and a 70,000 SF expansion next door. Wright Engineers donated over $110,000 of services toward the project.

Southwest Gas Northeast Centennial Operations Center North Las Vegas, NV
Southwest Gas Northeast Centennial Operations Center North Las Vegas, NV

Two tilt-up concrete office/warehouse buildings totaling 102,000 SF


Southwest Gas Southeast Operations Center Henderson, NV
Southwest Gas Southeast Operations Center Henderson, NV

58,000 SF concrete tilt-up office/warehouse facility, a 14,000 SF fabrication shop, and a sixteen-building training facility complex as well as the construction of the streets and utilities to support the operations center


Paradise Aviation Hangars Las Vegas, NV
Paradise Aviation Hangars Las Vegas, NV

Seven aircraft hangars along with adjacent offices, attached shops, garage stalls, and a two-story terminal building constructed on 10 acres adjacent to Harry Reid International Airport


Thatcher Chemical Plant Henderson, NV
Thatcher Chemical Plant Henderson, NV

Warehouse, boiler room building, maintenance shop, control room, tonner filling building, chlorine shelter, slab tank and storage areas and catwalk.


The Winning Combination Henderson, NV
The Winning Combination Henderson, NV

Three-story 88,000 SF tilt-up office, warehouse, and manufacturing facility


Insight Aircenter South Las Vegas, NV
Insight Aircenter South Las Vegas, NV
Three distinct single-story tilt-up concrete buildings totaling 130,000 SF

Cimarron Industrial Center Las Vegas, NV
Cimarron Industrial Center Las Vegas, NV

78,692 SF tilt up industrial building


Brunner Industrial Center Henderson, NV
Brunner Industrial Center Henderson, NV

3 tilt-up buildings totaling 54,000 SF


1 2 3