SEISMIC

S&L Las Vegas, NV
S&L Las Vegas, NV

– 47,480 SF remodel/strengthening project

– Loading on 9,200 SF of roof changed to floor loading

– Added 4,200 SF of an additional story on top of existing roof

– Strengthened steel framing to support change of loads on roof and the additional story

– Modified and strengthened the lateral force resisting system


Nevada Legislature Building Carson City, NV
Nevada Legislature Building Carson City, NV

– Seismic evaluation for the renovation and modernization

– New exterior granite finish


SIERRA LUXURY RENTALS Reno, NV
SIERRA LUXURY RENTALS Reno, NV

– 97,0000 SF adaptive re-use/expansion
– Added 17,400 SF mezzanine level between ground level and 2nd floor. Strengthened ground-level steel floor framing (basement below) for loads from mezzanine.
– Added 7,000 SF in two levels of framing on top of the original roof level. Strengthened roof framing to support load from new levels.
– Modified and strengthened the lateral force resisting system


Breakers Hotel Long Beach, WA
Breakers Hotel Long Beach, WA

Seismic retrofits for an oceanfront boutique hotel across 24 acres of coastline